Improving the Construction and Operation of Biomass Power Generation Projects - Implementation Plan
The implementation plan stipulates that biomass generation subsidies for 2020 will be capped at RMB 1.5 billion (USD 220 million). A new monitoring mechanism sets out which projects are eligible for subsidies, with a traffic light rating to reflect a province’s current levels of…
Renewable energy power purchase management guidelines
According to the national determined benchmark prices and the number of affordable acquisition hours, grid enterprises (include Transmission System Operator - TSO) need to buy all renewable energy electricity within the full acquisition planning under the premise to ensure the…
Notice on strengthening management of biomass power stations
The Notice encourages the development of biomass CHP power stations in Provinces and stresses out and importance of improving plants’ efficiency. The Notice forbids usage of forest and agriculture biomass residue mix for co-firing with fossil fuels. Claiming renewable energy…
Notice on solar PV deployment management and introduction of competitive bidding
To promote PV industry development sustainability, NEA introduced new mechanism of PV scale management and competitive quota, the bidder with lower price and other indicators will be awarded the right to build PV power plant. In order to further promote development of the solar…
Guidelines on promoting development of small hydropower projects in China
China recognises small hydropower installations as an important renewable energy source and a livelihood element. In order to implement Central Committee’s and State Council’s decisions on promotion of renewable energy development and energy revolution, the Ministry of Water…
Notice on the Administrative Measures for the Development and Construction of Offshore Wind Power
Thirty seven provisions of the Notice regulate every aspect of offshore wind project development starting from planning, project approval, check-up against environmental requirements to project construction and operation. The Notice also regulates development of offshore wind…
Notice on Provisional Management Measures for Distributed Wind Power Project Development and Construction for all provinces
The Notice was published by the National Energy Administration on 3 rd of April 2018. The Notice provides various technical and non-technical regulations for the construction and development of the onshore wind projects. Technical requirements: Distributed wind power projects…
Poverty alleviation project by installation of solar PV panels in poor households
NEA and Poverty Alleviation Office of the State Council decided to implement a poverty alleviation programme through installation of solar PV panels in the poor households in order to increase incomes of those households. The programme will run for a period of six years starting…
Feed-in tariff for renewable energy sources (levels for 2011-2017)
Renewable energy feed-in tariff scheme was introduced in Armenia in 2011. Since then, indicated renewable technologies were able to benefit from 15 year-long guaranteed feed-in tariffs. Tariffs are technology specific, submitted to yearly updates and expressed in AMD/kWh.…
The Strategic Development Program of Hydro energy Sector of the Republic of Armenia
The Program states that Armenia is rich in renewable energy sources and it forecasts that by 2025 they will be able to meet 30% of country’s energy demand. Hydroenergy is the most usable RE type in the country. In order to reach 30% of RE presence in the national energy mix…
Rajasthan net-metering policy 2015
The net metering policy for Rajasthan went into force on 26th of February 2015. The eligible parties installing rooftop PV installations are allowed to benefit from the net metering tariff of INR 7.5 per installed unit. The policy restricts the cumulative installation that can…
Uttar Pradesh net-metering regulations for rooftop solar PV
Uttar Pradesh Net-metering regulations for rooftop solar PV entered into force on 20th of March 2015. The tariff for rooftop PV installations under net-metering scheme is set to INR 7.06/kWh. The support runs for 25
National Wind-Solar Hybrid Policy
The Ministry of New and Renewable Energy (MNRE) adopted the National Wind-Solar Hybrid Policy on 14 May 2018. The objective of the policy is to provide a framework for the promotion of large grid-connected wind-solar PV hybrid system for efficient utilization of transmission…
Ujwal Bharat - Power Sector Reform & Energy Access
Ujwal Bharat is a scheme first put forth under the Prime Minister Narendra Modi in May of 2016. It includes power sector reform and general goals of lighting up or electrifying India's traditionally stranded and disconnected places. It's main mission underscores: 24 x 7…
Gujarat Small Hydel Policy 2016
The Gujarat Small Hydel Policy 2016 provides the framework for the State Government and its agencies to promote, support, facilitate and incentivize investments in small hydel projects in the State. The Government of Gujarat anticipates participation from investors in setting up…
The Uttar Pradesh Solar Power Policy 2017
Uttar Pradesh Solar Policy was drafted in 2017 and adopted early 2018. The key objectives of the policy are: to increase renewable installed capacity in the state to 10.7 GW by 2020 out of which 4.3 GW will come from rooftop solar (through Solar Rooftop Policy) and 6.4 GW will…
Accelerated depreciation tax benefit
The accelerated depreciation tax benefit for renewable energy plant developers was re-established on 30th of March 2014 after a two year long gap. The accelerated depreciation benefit was fixed on 80% level until 31st of March 2017. As of 1st of April 2017 the accelerated…
Andhra Pradesh Wind Power Policy 2015
The Andhra Pradesh Wind Power Policy 2015, in an order to promote wind power projects, was updated from the Andhra Pradesh Wind Power Policy, 2012. The Wind Power Policy, 2015 encourages, develops and promotes wind power generation in the State with a view to meet growing…
Uttar Pradesh renewable energy feed-in tariff 2014 - 2019 levels
The feed-in tariff policy was set up in order to boost the renewable energy generation in Uttar Pradesh region. The PPAs are granted for period fo 20 years. Ficial year means a period commencing on 1st April of a calendar year and ending on 31st March of the subsequent calendar…
Andhra Pradesh Solar Power Policy 2015
The Andhra Pradesh Solar Power Policy 2015, in an order to promote solar power projects, was updated from the Andhra Pradesh Solar Power Policy, 2012. Solar Power Projects (SPP) that are commissioned during the operative period of five years shall be eligible for the incentives…
India national onshore wind capacity auction (2nd round)
The Ministry of New and Renewable Energy (MNRE) aims to auction a total of 10 GW of wind power by 2019 through reverse bidding in order to bring the country closer to ids wind target. In 2016, India’s onshore wind capacity stood at 29 GW and country is aiming to reach 60 GW by…
National Action Plan on Climate Change
On 30 June, India released its first National Action Plan on Climate Change (NAPCC) outlining existing and future policies and programmes directed at climate change mitigation and adaptation. The plan outlines eight "national missions" running up to 2017, and ministries are…
Thermal efficiency regulation of solar water heaters (NOM-027-ENER/SCFI-2018)
The regulation establishes the thermal efficiency, gas savings and safety requirements of solar water heaters and solar water heaters backed by LPG (liquefied petroleum gas) or natural gas that are intended to be introduced into the Mexican market. Technical specifications,…
Scaling Up Renewable Energy Program for Armenia (SREP Armenia)
Scaling Up Renewable Energy Program for Armenia (SREP Armenia) was published in April 2014. It is an update to the Renewable Energy Roadmap from 2011. The SREP establishes new renewable energy production targets and underlines importance of the renewables deployment in a context…
Government Assistance for Renewable Energy Projects (Wind, Solar, Biofuel, Hydro)
The federal Indian government initially sought to support increased power generation from wind turbines in the 7th National Five Year Plan (1985 to 1990). The Ministry of New and Renewable Energy (MNRE) has since developed a range of policy measures and fiscal incentives to…
Madhya Pradesh Wind Power Project Policy 2012
Madhya Pradesh has a wind energy potential of around 5500 MW, whereas the total installed capacity is only 270 MW. The State Government proposes to promote wind energy as an additional and alternative source of energy through the Wind Power Project Policy,
RE Tariff regulations
The CERC issued regulations in September 2009 providing guidelines on how feed-in tariff rates for renewable energy projects are to be calculated, for projects that the Commission would set tariffs for. The regulations cover all renewable energy technologies, and are to be…
Capital Grants for Off-Grid and Decentralized Concentrated Solar Thermal (CST) Technologies for Community Cooking, Process Heat and Space Heating & Cooling Applications - Extension
On 26th February 2018 the Ministry of New and Renewable Energy of India (MNRE) issued Order extending capital grants support for Concentrated Solar Thermal (CST) until 2020. The subsidy is available for a variety of concentrating solar thermal applications, such as community…
Karnataka Solar Policy 2014-2021
The Karnataka Solar Policy 2014-2021 is an initiative the Karnataka Renewable Energy Policy 2014-2021 (Draft) and is an amended version of the Karnataka Solar Policy 2011-2016. The Government of Karnataka noted changes unfolding in the solar sector and achievements made by Solar…
Energy Conservation Building Code for residential buildings 2017 (DRAFT DUE TO BE FINALISED IN 2019)
The code aims at limiting heat gains/loss from building envelope and for ensuring adequate natural ventilation and day lighting. To limit the heat gain/loss from the building envelope, the code specifies: • Maximum value of Residential Envelope Transmittance Value (RETV) for…
Karnataka Renewable Energy Policy 2014-2021 (Draft)
The Karnataka Renewable Energy Policy recognizes the need for long term energy security and how volatile fossil fuel costs, global warming and climate change is promoting renewable power generation in the State. The policy follows the Karnataka Renewable Energy Policy 2009-14…
Kerala Wind Energy Policy
The Kerala Wind Energy Policy are developed guidelines for developing wind power generating stations through private developers, created due to the need for policy to take place while the Kerala Renewable Energy Policy 2002 took substantial time to
Mandatory use of Solar Water Heating Systems in Rajasthan
The Energy department of Rajasthan has issued a notification No. F.20(6)Energy/98 dated July 14 for mandatory the use of Energy Efficient Lamp vide notification. The notification mandates the use of solar water heating systems in Industrial buildings where hot water is required…
NOM-027-ENER / SCFI-2018: Thermal performance, gas saving and safety requirements of solar water heaters and solar water heaters with the support of a water heater that uses L.P. gas as fuel or natural gas. Specifications, testing methods and labelling.
This standard establishes the thermal performance specifications of solar water heaters for domestic and commercial use, thermosiphon type, that have a thermal tank with a maximum capacity of 500 liters; the gas saving of solar water heaters with the backing of a water heater…
Rules of Issuing Special Permission to Activity Concerning Alternative and Renewable Energy Source
Outlines rules and procedures of applying and issuing Special Permission for operating renewable energy plants. Permission can be issued to legal and physical persons; For all types of renewable energy plants with a capacity bigger than 10 kW; Applications must be made to the…
Government Assistance for Wind Power Development
The federal Indian government initially sought to support increased power generation from wind turbines in the 7th National Five Year Plan (1985 to 1990). The Ministry of New and Renewable Energy (MNRE) has since developed a range of policy measures and fiscal incentives to…
Rajasthan Policy for Promoting Generation of Electricity from Wind 2012
The Government of Rajasthan, in order to promote generation of power from Wind, implements the Policy for Promoting Generation of Electricity from Wind, 2012. The State Government may undertake review once again of this policy as and when the need arises in light of any new…
National Action Plan on Climate Change
India adopted its first National Action Plan on Climate Change (NAPCC) in 2008. The plan outlines existing and future policies and programmes directed at climate change mitigation and adaptation through eight national missions running up to 2017. The missions are wide ranging,…
Uttar Pradesh Mini-Grid Policy 2016
In 2016, Uttar Pradesh adopted a Mini-Grid Policy in order to speed up electrification process in rural areas of the province through a facilitation of renewable energy and mini-grids deployment. The mini-grids supported and regulated by the policy are to be installed in…
National energy income fund (Reddito energetico)
The national energy income fund, with a total budget of 200 mln euro, is aimed at the disbursement of capital grants or the provision of guarantees to cover investment costs for the construction of PV systems for domestic use, with the the objective of supporting energy…
Brightness Programme
The Brightness Program is an umbrella program, which includes the Township Electrification Program (TEP) (implemented 2002-2003), and the Village Electrification Program. The TEP included 20 MW of solar PV and wind, and 200 MW of small hydro to provide electricity for more than…
The Notice on the Establishment of Demonstration Areas for Large-Scale distributed solar PV Power Generation
The Notice mandates provinces to establish demonstration areas for large-scale distributed solar photovoltaic installations in order to further upscale solar generation and utilization in China. Provinces are obliged to select urban area and create large-scale deployment of…
Market entry standards for wind equipment manufacturing industry:
The Chinese government introduced specific regulations to improve the efficiency and competitiveness of the local wind equipment manufacturing market. The new standard first restricts the wind turbine manufacturing market to entities of a minimum production capacity of 2.5 MW.…
National certification and Implementation Supervision Commission, Energy Bureau on strengthening the photovoltaic products testing and certification work
In order to enhance the construction of the PV products' testing and certification system and regulate the industry's management, the Certification and Accreditation Administration of the People’s Republic of China and the National energy administration of the people's republic…
Notice on promotion of PV industry by exert the price leverage effect
In order to promote the development and utilization of renewable energy, since September 25, 2013, to other electricity levy charge renewable energy tariff except for residents living and agricultural production to 1.5 cents /
The Interim Measures for the management of photovoltaic power plant project
Regarding plan guidance and scale management, State Council authorities in charge of energy determine the scale and layout of photovoltaic power plant construction on the national level, and annual development scales on the province (autonomous region and municipality) level…
Interim procedures of management of the code of practice of PV manufacturing
For the manufacturing industry to strengthen the management of PV, guide the photovoltaic industry to speed up the transformation and upgrading, the enactment of this approach. On the photovoltaic manufacturing industry application and auditing and supervision and management in…
Notice regulating the standardization of the wind power equipment and generators quality
The Notice puts and obligation on provinces to strengthen the quality of wind power equipment and generators through standardize quality checking processes for wind plant equipment and windmills commissioning. The Notice underlines importance of transparent and clear processes…
Notice on further promotion of the distributes solar PV systems
The aim of the Notice is to further promote distributed solar PV installation in China. The Notice is directed to the provinces obliging them to strengthen further deployment of small-scale solar PV through: Planning implementation; Provision of financial incentives and…
Distributed photovoltaic power generation service guide of China Southern Power Grid Company Limited (Interim)
In order to strengthen services for distributed solar power projects and promote orderly development of photovoltaic industry coordinating, enactment of this service guide. Guide distributed in photovoltaic grid-connected applications, programme formulation and review,…