INTIEAMalaysia · Efficient Management of Electrical Energy Regulations 2008PolicyIn force

Efficient Management of Electrical Energy Regulations 2008

The law covers two main items: 1. requirement to disclose energy consumption for large electric energy consumers (3 000 000 kWhr or greater within 6 consecutive months). Failure to do so entails a fine not exceeding 5000 MYR 2. requirement that a registered electrical energy…

Last changed 9 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Malaysia · Year: 2008 · Status: In force · Level: National · Type: Voluntary

The law covers two main items:

1. requirement to disclose energy consumption for large electric energy consumers (3 000 000 kWhr or greater within 6 consecutive months). Failure to do so entails a fine not exceeding 5000 MYR

2. requirement that a registered electrical energy manager conducts the audit.

The details are:

A licensee or supply authority who supplies electrical energy for:-

Existing installation - shall submit to the Commission information or documents regarding the names and particulars of consumers whose total electrical energy consumption over any period not exceeding six consecutive months equals to or exceeds 3,000,000 kWh, not later than one month after the expiry of the period of six consecutive months from the effective date.

New installations - shall submit to the Commission information or documents regarding the names and particulars of consumers whose total electrical energy consumption over any period not exceeding six consecutive months equals to or exceeds 3,000,000 kWh, not later than one month after the expiry of the period of six consecutive months from the date the electrical energy supply is connected to the installation by the licensee or supply authority.

A private installation licensee

Existing installations - shall submit to the Commission information or documents regarding the total net electrical energy generation over any period not exceeding six consecutive months that equals to or exceeds 3,000,000 kWh, not later than one month after the expiry of the period of six consecutive months from the effective date.

New installations - shall submit to the Commission information or documents regarding the total net electrical energy generation over any period not exceeding six consecutive months that equals to or exceeds 3,000,000 kWh, not later than one month after the expiry of the period of six consecutive months from the date the installation starts to generate electrical energy.

Official source: http://www.st.gov.my/index.php/en/an-overview-of-the-efficient-management-of-electrical-energy-regulations-2008

Source

https://www.iea.org/policies/2387

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45352NewsIn force

Europe’s Russia Sanctions Have a Major Blind Spot

Over the last two years, the EU and UK have emerged as leading actors in imposing sanctions on Russia. But people like Maria Demertzis, Professor at the European University Institute in Italy, have raised questions around the effectiveness of the sanctions campaign, as European institutions continue to operate profitable subsidiaries in the country with little scrutiny. UK and EU regulators should broaden their sanctions campaign by increasing scrutiny of European businesses that remain economically exposed to Russia. The new UK Foreign Secretary,…

7 hours ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/petrobras_considers_exporting_lng-28-aug-2026-184485-article/?rss=trueNewsIn force

Petrobras Considers Exporting LNG

Brazil's national oil company is exploring the prospect of exporting liquefied natural gas from its giant offshore fields.

7 hours ago
INTEnergy Newsoilprice:oilprice-article-45341NewsIn force

The AI Boom Could Triple Data Center Water Use by 2030

The massive data center capacity scale-up underway has focused attention on the scale of water required for these facilities to operate. Rystad Energy estimates that without water-saving measures in place, global water consumption by data centers could rise to 644 billion liters per year by 2030. However, active mitigation could reduce demand to 388 billion liters, representing worst- and best-case scenarios as data center capacity ramps up, driven largely by the growing adoption of artificial intelligence (AI) in everyday life. Forecasting the…

8 hours ago
INTEnergy Newsoilprice:oilprice-news-45354NewsIn force

Venezuela Helped Build OPEC. Now It May Help Break It Apart

Venezuela helped create OPEC. More than six decades later, it is considering walking away, and Washington appears perfectly happy to hold open the door. Caracas is weighing whether to leave the Organization of the Petroleum Exporting Countries, Bloomberg reported Friday, citing people familiar with discussions that have included U.S. officials. No final decision has been made. Venezuela produced about 1.117 million barrels per day (bpd) in July according to OPEC’s secondary sources, and is currently exempt from OPEC production quotas after…

8 hours ago
INTEnergy Newsoilprice:oilprice-article-45342NewsIn force

Russia’s Energy Crisis Puts Kazakhstan in a Tough Spot

Kazakhstan is trying to keep the Kremlin at arm’s length amid Russian efforts to lean on Central Asian states for help in bolstering Moscow’s staggering war economy. Ukraine’s ongoing drone campaign has inflicted severe damage on Russia’s energy infrastructure and its military-industrial complex, prompting Russian officials to seek emergency energy supplies and refining arrangements from Central Asian states, while exploring offshoring options for arms production. …

9 hours ago