INTIEAUnited States · New Jersey Commercial Uniform Construction Code (NJAC 5:23-3.18)PolicyIn force

New Jersey Commercial Uniform Construction Code (NJAC 5:23-3.18)

-Revised, stricter opaque element and fenestration requirements at a reasonable level of cost-effectiveness -Improvements to daylighting controls, space-by-space lighting power density limits, and thresholds for toplighting -Revised equipment efficiencies for heat pumps,…

Last changed 8 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: United States · Year: 2016 · Status: In force · Level: State/Provincial · Type: Voluntary

-Revised, stricter opaque element and fenestration requirements at a reasonable level of cost-effectiveness

-Improvements to daylighting controls, space-by-space lighting power density limits, and thresholds for toplighting

-Revised equipment efficiencies for heat pumps, packaged terminal air conditioners (PTACs), single package vertical heat pumps and air conditioners (SPVHP and SPVAC), and evaporative condensers

-New provisions for commercial refrigeration equipment and improved controls for heat rejection and boiler equipment

-Improved requirements for expanded use of energy recovery, small-motor efficiencies, and fan power control and credits

-Improved equipment efficiencies for chillers

-Clarifications for the use of prescriptive provisions when performing building energy use modeling, and revisions to enhance capturing daylighting when performing modeling calculations

-A new alternate compliance path to Section 6, "Heating, Ventilating, and Air-Conditioning," for computer room systems, developed with ASHRAE Technical Committee (TC) 9.9.

Lighting Alterations. For the alteration of any lighting system in an interior space, that space shall comply with the lighting power density (LPD) requirements of Section 9 applicable to that space and the automatic shutoff requirements of Section 9.4.1.1. For the alteration of any lighting system in an exterior building application, that lighting system shall comply with the lighting power density (LPD)

requirements of Section 9 applicable to the area illuminated by that lighting system and the applicable control requirements of Sections 9.4.1.4(a) and 9.4.1.4(b). Such alterations shall include all luminaires that are added, replaced or removed. This requirement shall also be met for alterations that involve only the replacement of lamps plus ballasts. Alterations do not include routine maintenance or repair situations.

7. SERVICE WATER HEATING

7.1 General

7.1.1 Service Water Heating Scope

7.1.1.1 New Buildings. Service water heating systems

and equipment shall comply with the requirements of this

section as described in Section 7.2.

7.1.1.2 Additions to Existing Buildings. Service water

heating systems and equipment shall comply with the requirements of this section.

Exception: When the service water heating to an addition is provided by existing service water heating systems and equipment, such systems and equipment

shall not be required to comply with this standard.

However, any new systems or equipment installed

must comply with specific requirements applicable to

those systems and equipment.

7.1.1.3 Alterations to Existing Buildings. Building service water heating equipment installed as a direct replacement

for existing building service water heating equipment shall

comply with the requirements of Section 7 applicable to the

equipment being replaced. New and replacement piping shall

comply with Section 7.4.3.

Envelope Alterations. Alterations to the building

envelope shall comply with the requirements of Section 5 for

insulation, air leakage, and fenestration applicable to those

specific portions of the building that are being altered.

Official source: http://arkanarzesh.com/wp-content/uploads/2016/09/ASHRAE%2090.1-2013%20%20-IP.pdf

Source

https://www.iea.org/policies/7086

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45339NewsIn force

Egypt’s LNG Comeback Is Set to Start in Cyprus

Egypt’s gas sector is running short of domestic gas just as Cyprus prepares to become a producer. The recently approved Cronos project offshore Cyprus (expected to deliver up to 2.8 million tonnes per year of LNG from 2028) offers a three-way bargain. Cyprus gains an export route it cannot economically build alone; Egypt secures feedstock for infrastructure increasingly constrained by falling domestic production, and Europe gains another non-Russian source. The logic is compelling, but technical, commercial and geopolitical risks could still…

23 hours ago
INTEnergy Newsoilprice:oilprice-article-45338NewsIn force

East Africa’s Oil Rivalry Spurs Multi-Billion-Dollar Projects Across The Region

Last month, we reported that Nigerian billionaire and Africa’s richest man, Aliko Dangote, has agreed to build a $17 billion (Ksh2.2 trillion), 700,000-barrel-per-day refinery on Kenya’s Lamu Island that would process crude not only for Kenya but also its neighbors such as Uganda, Rwanda, Burundi, South Sudan and the DRC. The giant refinery--Africa’s second largest refinery behind only Nigeria’s Dangote refinery--would easily exceed East Africa’s current refined fuel demand of roughly 450,000 bpd, leaving room to supply…

24 hours ago
INTEnergy Newsoilprice:oilprice-article-45337NewsIn force

DoE Begins Tests for Fracked Geothermal

The Trump administration is no friend of wind and solar. Axed subsidies and project suspensions have been the attitude towards those alternative forms of energy. Geothermal, however, is something else. The current Department of Energy is very much for it. In fact, it is so much for it that it funded an experiment that would show whether fracking technology could be used to generate geothermal anywhere in the world. Geothermal energy is, simply put, heat. It is heat that is generated from the decay of radioactive elements in the planet’s mantle.…

1 day ago
INTEnergy Newsoilprice:oilprice-article-45336NewsIn force

Europe Heads Into Winter With Gas Storage at a Two-Decade Low

Europe is heading for the winter with one of the lowest levels of gas in storage in the past two decades as the war in the Middle East crippled LNG supply from Qatar, sent gas and LNG prices in Europe and Asia skyrocketing, and intensified competition for the shrunk pool of readily available global LNG cargoes. A perfect storm of elevated demand for filling depleted storage and electricity during the summer heatwaves, and slashed global LNG supply with Qatar’s cargoes trapped behind the Strait of Hormuz have pushed European benchmark prices…

1 day ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/oil_rises_as_iran_deal_hopes_fade-27-aug-2026-184478-article/?rss=trueNewsIn force

Oil Rises as Iran Deal Hopes Fade

Oil rose as doubts grew over a broader US-Iran agreement.

1 day ago