INTIEAUnited States · IECC 2012 with amendments - Commercial Building Code (Ohio)PolicyIn force

IECC 2012 with amendments - Commercial Building Code (Ohio)

Insulation and Fenestration Criteria The building thermal envelope shall meet the requirements of Tables C402.2 and C402.3 based on the climate zone specified in Chapter 3. Commercial buildings or portions of commercial buildings enclosing Group R occupancies shall use the…

Last changed 8 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: United States · Year: 2017 · Status: In force · Level: State/Provincial · Type: Voluntary

Insulation and Fenestration Criteria

The building thermal envelope shall meet the requirements of Tables C402.2 and C402.3 based on the climate zone specified in Chapter 3. Commercial buildings or portions of commercial buildings enclosing Group R occupancies shall use the R-values from the “Group R” column of Table C402.2. Commercial buildings or portions of commercial buildings enclosing occupancies other than Group R shall use the R-values from the “All other” column of Table C402.2. Buildings with a vertical fenestration area or skylight area that exceeds that allowed in Table C402.3 shall comply with the building envelope provisions of ANSI/ASHRAE/IESNA 90.1.

Specific Insulation Requirements (Prescriptive)

Opaque assemblies shall comply with Table C402.2. Where two or more layers of continuous insulation board are used in a construction assembly, the continuous insulation boards shall be installed in accordance with Section C303.2. If the continuous insulation board manufacturer’s installation instructions do not address installation of two or more layers, the edge joints between each layer of continuous insulation boards shall be staggered.

Fenestration (Prescriptive)

Fenestration shall comply with Table C402.3. Automatic daylighting controls specified by this section shall comply with Section C405.2.2.3.2.

Air Leakage (Mandatory)

The thermal envelope of buildings shall comply with Sections C402.4.1 through C402.4.8.

Service Water Heating (Mandatory)

Water-heating equipment and hot water storage tanks shall meet the requirements of Table C404.2. The efficiency shall be verified through data furnished by the manufacturer or through certification under an approved certification program.

Lighting Controls (Mandatory)

Lighting systems shall be provided with controls as specified in Sections C405.2.1, C405.2.2, C405.2.3 and C405.2.4.

On-Site Renewable Energy

Total minimum ratings of on-site renewable energy systems shall comply with one of the following:

1. Provide not less than 1.75 Btu (1850 W), or not less than 0.50 watts per square foot (5.4 W/m2) of conditioned floor area.

2. Provide not less than 3 percent of the energy used within the building for building mechanical and service water heating equipment and lighting regulated in this chapter.

Total Building Performance

Compliance with this section requires that the criteria of Sections C402.4, C403.2, C404 and C405 be met.

2012 IECC amendments

1. Section C101.4.3

a. Exception 5 shall read "Roof recover or roof repair."

b. Exception 6 shall read "Roofs without insulation in the cavity and where the sheathing or insulation is exposed during reroofing shall be insulated either above or below the sheathing."

c. Renumber exceptions 6, 7, and 8 as 7, 8, and 9.

2. Section C202 add the following definitions

REROOFING. The process of recovering or replacing an existing roof covering. See "Roof recover" and "Roof replacement."

ROOF RECOVER. The process of installing an additional roof covering over a prepared existing roof covering without removing the existing roof covering.

ROOF REPAIR. Reconstruction or renewal of any part of an existing roof for the purpose of its maintenance.

ROOF REPLACEMENT. The process of removing the existing roof covering, repairing any damaged substrate and installing a new roof covering.

3. Section C402.2.1.1

Delete existing section and Table C402.2.1.1 and replace with new section which reads "C402.2.1.1 Roof replacement. For roof replacements, where the existing roof assembly is part of the building thermal envelope and contains insulation entirely above deck, roof replacement shall include compliance with the requirements of Table C402.1.2 or Table C 402.2." 1301.3

Official source: http://bcpad.net/Code%20Books/IECC%202012.pdf

Source

https://www.iea.org/policies/7122

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45339NewsIn force

Egypt’s LNG Comeback Is Set to Start in Cyprus

Egypt’s gas sector is running short of domestic gas just as Cyprus prepares to become a producer. The recently approved Cronos project offshore Cyprus (expected to deliver up to 2.8 million tonnes per year of LNG from 2028) offers a three-way bargain. Cyprus gains an export route it cannot economically build alone; Egypt secures feedstock for infrastructure increasingly constrained by falling domestic production, and Europe gains another non-Russian source. The logic is compelling, but technical, commercial and geopolitical risks could still…

23 hours ago
INTEnergy Newsoilprice:oilprice-article-45338NewsIn force

East Africa’s Oil Rivalry Spurs Multi-Billion-Dollar Projects Across The Region

Last month, we reported that Nigerian billionaire and Africa’s richest man, Aliko Dangote, has agreed to build a $17 billion (Ksh2.2 trillion), 700,000-barrel-per-day refinery on Kenya’s Lamu Island that would process crude not only for Kenya but also its neighbors such as Uganda, Rwanda, Burundi, South Sudan and the DRC. The giant refinery--Africa’s second largest refinery behind only Nigeria’s Dangote refinery--would easily exceed East Africa’s current refined fuel demand of roughly 450,000 bpd, leaving room to supply…

24 hours ago
INTEnergy Newsoilprice:oilprice-article-45337NewsIn force

DoE Begins Tests for Fracked Geothermal

The Trump administration is no friend of wind and solar. Axed subsidies and project suspensions have been the attitude towards those alternative forms of energy. Geothermal, however, is something else. The current Department of Energy is very much for it. In fact, it is so much for it that it funded an experiment that would show whether fracking technology could be used to generate geothermal anywhere in the world. Geothermal energy is, simply put, heat. It is heat that is generated from the decay of radioactive elements in the planet’s mantle.…

1 day ago
INTEnergy Newsoilprice:oilprice-article-45336NewsIn force

Europe Heads Into Winter With Gas Storage at a Two-Decade Low

Europe is heading for the winter with one of the lowest levels of gas in storage in the past two decades as the war in the Middle East crippled LNG supply from Qatar, sent gas and LNG prices in Europe and Asia skyrocketing, and intensified competition for the shrunk pool of readily available global LNG cargoes. A perfect storm of elevated demand for filling depleted storage and electricity during the summer heatwaves, and slashed global LNG supply with Qatar’s cargoes trapped behind the Strait of Hormuz have pushed European benchmark prices…

1 day ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/oil_rises_as_iran_deal_hopes_fade-27-aug-2026-184478-article/?rss=trueNewsIn force

Oil Rises as Iran Deal Hopes Fade

Oil rose as doubts grew over a broader US-Iran agreement.

1 day ago