Germany awarded 2.135 GW of utility-scale solar capacity across 261 bids at an average €0.0479/kWh, with Bavaria receiving the largest share.
The post Germany allocates 2.1 GW in latest ground-mounted PV tender, lowest bid comes in at €0.043/kWh appeared first on pv magazine Global.
Source
https://www.pv-magazine.com/2026/08/18/germany-allocates-2-1-gw-in-latest-ground-mounted-pv-tender-lowest-bid-comes-in-at-e0-043-kwh/Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.