Oswal Pumps plans to invest $48 million in a TOPCon solar cell manufacturing facility in Karnal, in the Indian state of Haryana. Commercial production is expected to begin by April 2028, with the entire output earmarked for captive solar module manufacturing.
The post Oswal Pumps to set up 1.2 GW TOPCon solar cell factory in India appeared first on pv magazine Global.
Source
https://www.pv-magazine.com/2026/10/14/oswal-pumps-to-set-up-1-2-gw-topcon-solar-cell-manufacturing-facility/Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.