USPHMSAFR-2026-10782NewsIn force

Pipeline Safety: Class Location Change Requirements; Correction

PHMSA issues a technical correction to clarify the 24-month deadline for implementing integrity management alternatives when gas transmission pipeline operators restore maximum allowable operating pressure following class location changes. The deadline runs from the later of the final rule's effective date or when the operator decides to initiate restoration, aligning with MAOP confirmation timelines.

Last changed 3 months ago.

Extracted view for reading · Original for compliance evidence

PHMSA is making a technical correction to a January 14, 2026 final rule that amended the class location change requirements. The final rule allows an operator to confirm or to restore the maximum allowable operating pressure (MAOP) of an eligible gas transmission pipeline segment that experiences a class location change by implementing an integrity management (IM) alternative. For MAOP restorations, PHMSA is clarifying in this correction notice that the 24-month deadline for implementing the initial programmatic requirements of the IM alternative runs from the effective date of the final rule or the date that an operator decides to initiate an MAOP restoration, whichever is later. This clarification is consistent with the requirements in the final rule, including the deadline in the IM alternative that applies to MAOP confirmations, which runs from the effective date of the final rule or the date of the class location change, whichever is later.

Source

https://www.federalregister.gov/documents/2026/05/29/2026-10782/pipeline-safety-class-location-change-requirements-correction

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in United States

US10 CFR10 CFR Part 725Secondary legislationIn force

Permits for Access to Restricted Data

10 CFR Part 725 establishes procedures for issuing Access Permits that authorize qualified persons to access Restricted Data related to civil uses of atomic energy, including data on atomic weapons design, special nuclear material production, and nuclear energy applications. The regulation defines permit terms, conditions, available information categories, and DOE's Office of Environment, Health, Safety and Security authority to issue, amend, renew, suspend, or revoke permits.

2 days ago
US10 CFR10 CFR Part 781Secondary legislationIn force

DOE Patent Licensing Regulations

DOE patent licensing regulations establish procedures for granting nonexclusive, exclusive, or partially exclusive licenses to inventions from DOE-supported research and development. The Secretary of Energy determines license grants based on U.S. national interests. The regulations define appeal rights for denied applicants, terminated licensees, and third-party objectors, with appeals filed to the Deputy General Counsel within 30 days of agency action.

2 days ago
US10 CFR10 CFR Part 50Secondary legislationIn force

Domestic Licensing of Production and Utilization Facilities

10 CFR Part 50 establishes the NRC's licensing framework for domestic nuclear production and utilization facilities under the Atomic Energy Act of 1954. It defines key regulatory terms including applicants, atomic energy, basic components, byproduct materials, and alternate AC power sources, and establishes that persons knowingly providing goods or services to licensees may be subject to NRC enforcement action for violations.

3 weeks ago
US10 CFR10 CFR Part 33Secondary legislationIn force

Specific Domestic Licenses of Broad Scope for Byproduct Material

10 CFR Part 33 establishes requirements for issuing specific domestic licenses of broad scope for byproduct material. It defines three license types (A, B, C) with varying possession limits for radioactive materials, specifies application procedures using NRC Form 313, and incorporates related regulatory requirements from 10 CFR Parts 30 and 37. OMB approval control numbers are provided for information collection requirements.

3 weeks ago
US10 CFR10 CFR Part 39Secondary legislationIn force

Licenses and Radiation Safety Requirements for Well Logging

10 CFR Part 39 establishes licensing and radiation safety requirements for the use of licensed materials—including sealed sources, radioactive tracers, markers, and uranium sinker bars—in well logging operations. The regulation prescribes definitions, operational requirements, supervisory standards, and compliance obligations for persons handling radioactive sources at temporary jobsites, including personal supervision, safety reviews, and cross-referenced NRC regulatory provisions.

3 weeks ago